HYBO Energy
| Still deciding? Get samples of $ ! US$ 10/Piece Request Sample |
As a leading subsidiary of a top 500 manufacturing enterprise in China, we operate two major production basements covering an area of 270,000 sqm. With over 20 years of development, we have established ourselves as one of the most influential brands in the industry, focusing on sustainable development and green integrated industry models.
Our expertise lies in the research, manufacturing, and sales of prepainted aluminium coils (PPAL), prepainted steel coils (PCM), solid aluminium sheets, ACP, and decorative energy-saving composite panels. We provide customized product solutions that promote building industrialization, utilizing first-class equipment and the largest production scale in Asia.
Equipped with 8 roller coating production lines, 10 slitting & cutting lines, and dedicated lines for ACP and insulated panels, our annual capacity reaches 100,000MT for PPAL and 1 million SQM for insulated panels. These materials are widely used for curtain walls, interior/exterior systems, and roofing, meeting diverse global requirements.
The Integrated System for Decoration and Energy Conservation is an advanced building structure that integrates insulation, heat insulation, waterproofing, and decoration into a single system. It is specifically designed for non-curtain wall type buildings, utilizing a combined installation method of bonding and riveting for maximum stability and efficiency.
| Aluminum thickness | Rockwool | Back sheet | Surface |
| 0.8-1.5mm | 30-150mm; 80-150g/m3 | 4mm | PPAL Finish |
| Fireproof Level | Dimensions | Accessories | Insulation Choice |
| Grade A | Width 300-1250mm; Length 300-5800mm | Fasteners, sealant, foam rod, mortar | Rockwool (Primary), Others optional |
Safe Handling: All products are packed using reinforced wood pallets to ensure maximum safety during transit. We offer shipping via FCL or LCL through sea, air, or rail transport depending on the destination.
Timeline: Cargo is typically finished within 20-30 days, confirmed based on specific drawing requirements and production schedules.