HYBO Energy
| Still deciding? Get samples of $ ! US$ 0.01/Piece Order Sample |
| Model NO. | Single-axis Bracket-005 |
| Certification | GB, ISO, CE, RoHS |
| Application | Commercial / Utility-Scale |
| Material | High-Strength Steel |
| Type | Ground Bracket Tracking System |
| System Type | 2~5rows Linked Type/Independent Type |
| Motor | DC24v Gear Motor |
| Max. Wind Speed | Operation: 24m/S | Stow: 37m/S |
| Rust Protection | Hot-Dipped Galvanized Steel (HDG) |
| Operation Temp. | -40ºC ~ +75ºC |
| Control Model | Astronomical Algorithms + Tilt Sensor Close-loop Control |
| Tracking Accuracy | ≤2° (Configurable) |
| Protection Grade | IP66 |
| Production Capacity | 100,000 Tons / Year |
| Package Size | 25.00cm * 27.00cm * 22.00cm |
| Gross Weight | 500.000kg |
| Parts Packaging | Wooden Boxes or Pallets |
| Profile Packaging | Tied with Steel Strips |
Heavy-Duty Hot-Dipped Galvanized Single Axis Mounting Structure
This tracking system is engineered specifically for large-scale utility power stations. Utilizing Q235/355B steel with a superior hot-dip galvanizing process, it ensures a salt spray corrosion resistance life of over 30 years. The system supports automatic single-axis tracking with a ±45° tilt range, increasing annual power generation by 25% to 35% compared to fixed structures.
| Drive Type | Independent Drive |
| Panel Compatibility | 2-10 Pieces (≤23 sq.m.) / Supports up to 670W+ |
| Power Consumption | 5.0Kwh/set/year |
| Azimuth Range | ±45ºC |
| Control Method | Manual Remote + Remote Computer Control |
| Accuracy | 0.1°-2° (Adjustable) |
Hot dip galvanizing (ISO certified) provides a lifespan 3x longer than standard galvanizing.
Wind resistance up to Level 15 (80m/s) and snow load capacity of 2.5kN/m2 for extreme climates.
Modular pre-installed design reduces labor costs by 40%. Typical setup is 5-7 days per MW.
Maintenance-free bearings and IP67 protected motors ensure minimal O&M expenses.




Spiral piles for sandy/frozen soil or concrete foundations (depth ≥ 1.5m), spaced 4-6m apart.
Assemble galvanized columns and beams, securing bolts with a torque of 35-40N·m.
Install tracking motor and PLC controller. Debug tilt accuracy to error ≤ 0.5°.
Fix components with pressure blocks and perform wind load simulation (lateral tension ≥ 50kg).
| Project Name | Achievement / Performance |
|---|---|
| Dubai Desert Power Station (500MW) | Annual power generation increased to 820 million kWh; LCOE at $0.013/kWh. |
| Atacama Photovoltaic Park (300MW) | Zero corrosion after 10 years in high-salt environment; IRR of 15.3%. |
| Grassland Power Station (200MW) | 1.8m ground clearance allows for livestock/vegetation growth; dual land use. |

